Dietrich Engineering Limited prepares drainage reports under the Drainage Act based on field surveys, information from appropriate government agencies, previous drainage reports, watershed delineation, and any other relevant information. Final design includes report, plans, specifications, construction cost estimates and schedules of assessments.

Final report includes report, plans, specifications, construction cost estimates and schedules of assessments. Drainage superintendent services include the supervision and inspection of existing municipal drain repairs and maintenance, contract administration, and assisting municipal staff with the preparation of drainage by-laws, assessment schedules, and preparation of grant applications.
Services
The Royal Oak Municipal Drain 2016 was a project initiated under the Drainage Act to improve the condition of an open channel of over nine kilometers in length. With a watershed area of over 1,200 Hectares (over 3,050 acres), the project involved nearly 70 individual landowners and 12 roads.

Maintenance was last carried out nearly 48 years ago, resulting in the deterioration of the existing channel to a very poor state of repair which was experiencing severe levels of erosion throughout most of the length of the channel.Some portions of the Royal Oak Creek provide areas of excellent fish habitat including highly vegetated areas; pool-riffle sequences; and natural nested channel cross sections.
Dietrich Engineering Limited was retained by the Municipality of South Huron to design and construct a stormwater management (SWM) facility as a means of flood control in the southeast part of Exeter with the intent of helping to alleviate the localized flooding caused by the insufficiency of existing drainage systems to adequately convey runoff from approximately 82 hectares of upstream agricultural land to a sufficient outlet.